Natanz Iron Smelting Complex has put the following production plans in the form of projects in order to increase productivity and improve production.
1. Increasing 3 induction furnaces of 10 tons along with upgrading the casting station of steel factory No. 1
2. Installation and operation of VOD system in steel factory No. 2 for the production of alloy steels, including stainless steel, and increasing the variety of products in its product portfolio.
3. Steelmaking project number 3, which includes 2 electric arc furnaces of 120 tons and its products are ingots and slabs with different brands.